
Merloni Elettrodomestici
FULL NO FROST COMBINED UNIT (2003)
Technical Manual
GB 04-10-28/01 15-43
Language Issue/Edition Page
The start and end of the defrost phase are controlled by the electronic board, taking
into account:
Start of defrost
• total compressor On time from last defrost (on average11 hours). In any case the
period between two defrosts will be: max. 30 hours, min. 8 hours.
• duration of last defrost
• number of door openings
End of defrost
• reaching the temperature of approx. 15 °C on the evaporator and in any case
approx. 40 minutes after the start of defrost.
POSSIBLE CAUSE OF MALFUNCTION:
Board management
Heating elements control circuit on the board
Connection on the board
Wiring harness
Thermal fuses
Connection on heating elements
Heating elements
Drain hole blocked
TESTING:
General on appliance: carry out the check using the Autotest procedure.
Wiring: check for continuity and short circuits; check the connections (connectors and
terminals); check whether voltage is available; check non-opening of thermal fuses;
Component: check that the component is fed; directly check the heating elements
(fed directly).
Board: carry out a quick visual check of the board (breakages or burnouts, etc.);
check by means of replacement.
Komentarze do niniejszej Instrukcji